Core Capabilities

Preventive Maintenance (AMC)

Preventive Maintenance (AMC)

Scheduled on-site maintenance visits and inspections that catch issues before they cause downtime.
Comprehensive & Non-Comprehensive AMC Packages

Comprehensive & Non-Comprehensive AMC Packages

Structured AMC contracts tailored to your plant’s criticality and budget — full parts-and-labour coverage or diagnostics-only options.
Panel & Drive Retrofitting

Panel & Drive Retrofitting

On-site upgrade of legacy panels, drives and control systems to modern platforms without a full replacement.
Life-Extension Programs

Life-Extension Programs

Structured upgrade paths for aging installations, extending equipment life before a full replacement is needed.
Scheduled Inspection Reporting

Scheduled Inspection Reporting

Regular condition reports after every maintenance visit, giving you a documented maintenance history for each asset.

How AMC & Retrofitting Differs From Test & Repair Centre

Short clarifying section for site visitors who may be unsure which service applies to them.

  • ► AMC & Retrofitting: scheduled, on-site preventive maintenance and panel/drive upgrades — for keeping installed equipment running well
  • ► Test & Repair Centre: in-house, lab-based component-level repair for a drive that has already failed — see our dedicated Test & Repair Centre page

Industries Served

Textile

Pharmaceuticals 

Automotive

Cement

Steel

Any Facility With Installed Automation Equipment

Our Case Studies

Proven solutions, Reliable performance, Real-world result

CASE STUDY 1

Cutting Drive Failures With a Yearly AMC — Kapilansh Dhatu Udyog Pvt. Ltd.

Client Industry
Metals / Metallurgical Manufacturing

Problem Statement:

A metallic-dust plant environment was damaging drive electronics, resulting in approximately 2–3 drive failures per month — frequent machine breakdown, production loss and increased maintenance requirements.

Our Solution:

Recommended and implemented a yearly Drive Service & Maintenance AMC, introducing a preventive maintenance approach in place of reactive breakdown repair.

Results Delivered:

Drive failure frequency dropped from 2–3 per month to approximately 1 every 2–3 months. The customer was satisfied with the improvement and has renewed the AMC every year since.

CASE STUDY 2

From Regular Breakdowns to Zero Reported Failures — Venus Paper Industry

Client Industry
Paper Manufacturing

Problem Statement:

A 15-year-old machine was experiencing regular breakdowns, creating reliability problems and interrupting production.

Our Solution:

Recommended machine panel retrofitting rather than full machine replacement. Retrofitted one machine’s panel first as a pilot, then proceeded to complete retrofitting across all machines once the pilot’s results were confirmed.

Results Delivered:

Recommended machine panel retrofitting rather than full machine replacement. Retrofitted one machine’s panel first as a pilot, then proceeded to complete retrofitting across all machines once the pilot’s results were confirmed.